Evaluating the Accuracy and Use of Drilled Shaft Integrity Testing Methods in Illinois
项目名称: Evaluating the Accuracy and Use of Drilled Shaft Integrity Testing Methods in Illinois
摘要: The main objective of this project is to provide guidelines for the use of integrity testing for drilled shafts that considers shaft diameter and length, number of drilled shafts to be constructed, soil and rock conditions, expected wet vs. dry method of construction, redundancy of shafts, and importance of the structure. A simple �integrity testing selection� flowchart will be developed to be used by designers for determining the timing, type, and level of integrity testing that should be conducted for a particular structure when drilled shafts are the chosen foundation support.
状态: Active
资金: 448027
资助组织: Illinois Department of Transportation
管理组织: University of Illinois, Urbana-Champaign
主要研究人员: Osouli, Abdolreza
开始时间: 20180201
预计完成日期: 20200731
实际结束时间: 0
检索历史
应用推荐