Two-tube Metal Rail Compliance Testing
项目名称: Two-tube Metal Rail Compliance Testing
摘要: The Manual for Assessing Safety Hardware (MASH) implementation date for all bridge railing designs to meet the requirements of MASH is December 2019. There is a need to re-evaluate commonly used bridge rails with respect to MASH Requirements. The purpose of this project will be to evaluate the Alaska 2-Tube Bridge Rail, Alaska Thrie-Beam transition, and Alaska W-Beam transition with respect to MASH requirements. The plan is to evaluate the existing Alaska 2-Tube rail design with respect to MASH TL-3 impact conditions. The purpose of this project will be to make design improvement(s) as necessary for the bridge rail and transitions and evaluate the performance of these designs using full scale crash testing with respect to MASH guidelines.
状态: Completed
资金: 485254
资助组织: Federal Highway Administration
管理组织: Alaska Department of Transportation and Public Facilities
执行机构: Texas A&M Transportation Institute
开始时间: 20170504
预计完成日期: 20191231
实际结束时间: 0
检索历史
应用推荐