摘要: |
This work plan covers fabrication and load testing of one Chem-Nuclear Systems (CNS) 1-13G Cask lid Support Frame, per the attached drawing. The support frame is considered to be developmental equipment and as such may be fabricated in accordance with the engineering requirements and responsibilities identified in WHC-CM-6-1, Standard Engineering Practices, EP-2.4 Development Control Requirements. A final acceptance and load test is required by February 24, 1995. WHC will provide a released as-built drawing of the support frame by February 22, 1995 to allow final acceptance to occur prior to the completion date. |