The objective of this research project is to develop high early strength concrete mixture criteria or designs that can do the following: (1) satisfy current Kansas Department of Transportation (KDOT) minimum strengths for opening to traffic in 4 to 24 hours; and (2) provide a 20-year pavement or 50-year bridge service life.