Accuracy of In-Situ Water-to-Cement Meters for Concrete
项目名称: Accuracy of In-Situ Water-to-Cement Meters for Concrete
摘要: The primary objective of this research project is to determine the precision of the water cement (w/c) meter based on various Utah Department of Transportation (UDOT) concrete mixtures. Secondary objective is to determine the influence on the w/c reading from the in-situ microwave meter from various materials or admixtures added to the concrete for UDOT projects.
状态: Active
资金: 30948
资助组织: Utah Department of Transportation
管理组织: Utah Department of Transportation
项目负责人: Stevens, David
执行机构: Utah Department of Transportation
主要研究人员: Bordelon, Amanda
开始时间: 20150819
预计完成日期: 20161215
实际结束时间: 0
检索历史
应用推荐