Midpoint Runway Marking
项目名称: Midpoint Runway Marking
摘要: The aviation industry continues to experience landing overruns due in part to pilots touching down beyond the midpoint of the available runway. In some landing overruns, pilots were unaware that the midpoint was reached and nonetheless �forced� the landing instead of implementing the go-around/aborted landing procedure. Incident reports confirmed that forced landings were coupled with frequent overruns. Over the years airport operators and pilots have occasionally reported that knowing the location of the midpoint of runways would help them to minimize such accidents. There is a greater tendency for landing overruns at airports that primarily serve general aviation operations with runway lengths less than 4200 feet in length and being utilized by student pilots and those pilots that primarily fly on the weekends only. In order to identify potential markings that can assist in mitigating this risk, the research team will evaluate the design for and potential benefits of a marking placed at or near the midpoint of a general aviation runway that would inform pilots of the potential for an overrun/overshoot on a landing.
状态: Completed
资金: $160,877.62
资助组织: Federal Aviation Administration
项目负责人: Cyrus, Holly
执行机构: Purdue University, Polytechnic
主要研究人员: Dillman, Brian
开始时间: 20150713
预计完成日期: 20160930
实际结束时间: 20160930
检索历史
应用推荐