项目名称: | Developing Girder Strands into the Cap Beam for a Positive Moment Connection |
摘要: | To maximize the seismic resistance in the longitudinal direction of a bridge made from precast, pre-stressed concrete girders, the columns, cap beam and girders must be connected in such a way as to provide flexural resistance. Therefore, the goal of the research is to determine a good method for anchoring the strands in the cap beam, and to verify it by testing. |
状态: | Proposed |
资金: | 0.00 |
资助组织: | Washington State Department of Transportation |
项目负责人: | Maurer, Marc |
开始时间: | 20150701 |
预计完成日期: | 0 |
实际结束时间: | 0 |