Developing Girder Strands into the Cap Beam for a Positive Moment Connection
项目名称: Developing Girder Strands into the Cap Beam for a Positive Moment Connection
摘要: To maximize the seismic resistance in the longitudinal direction of a bridge made from precast, pre-stressed concrete girders, the columns, cap beam and girders must be connected in such a way as to provide flexural resistance. Therefore, the goal of the research is to determine a good method for anchoring the strands in the cap beam, and to verify it by testing.
状态: Proposed
资金: 0.00
资助组织: Washington State Department of Transportation
项目负责人: Maurer, Marc
开始时间: 20150701
预计完成日期: 0
实际结束时间: 0
检索历史
应用推荐