原文传递 Site Operator technical report. Final report (1992--1996)
题名: Site Operator technical report. Final report (1992--1996)
关键词: 33 ADVANCED PROPULSION SYSTEMS ;29 ENERGY PLANNING AND POLICY; ELECTRIC-POWERED VEHICLES; PROGRESS REPORT; COMMERCIALIZATION; ELECTRIC UTILITIES; FIELD TESTS; ELECTRIC BATTERIES; COORDINATED RESEARCH PROGRAMS
摘要: The Southern California Edison Company (SCE) and the US Department of Energy (DOE) entered into cooperative agreement No. DE-FC07-91ID13077 on August 23, 1991, which expired on August 3, 1996. This cooperative agreement provided SCE with DOE cofunding for participation in the DOE`s Electric and Hybrid Vehicle Site Operator Program. In return, SCE provided the DOE with quarterly progress reports which include operating and maintenance data for the electric (EVs) vehicles in SCE`s fleet. Herein is SCE`s final report for the 1992 to 1996 agreement period. As of September 1, 1996 the SCE fleet had 65 electric vehicles in service. A total of 578,200 miles had been logged. During the agreement period, SCE sent the DOE a total of 19 technical reports (Appendix B). This report summarizes the technical achievements which took place during a long, productive and rewarding, relationship with the DOE.
总页数: 63p
报告类型: 科技报告
检索历史
应用推荐