摘要: |
This report describes an analysis of the near-term commercial light water reactor (LWR) spent fuel transportation system. The objective was to determine if the existing commercial spent fuel shipping cask fleet is adequate to provide the needed transportation services for the period of time the US government would be authorized to accept spent fuel for Federal Interim Storage (FIS). A spent fuel shipping cask supply-demand analysis was performed to evaluate the existing fleet size. The results of the shipping cask handling capability study indicated that by weight, 75%of the spent fuel shipments will be by truck (overweight plus legal-weight truck). From the results of the shipping cask supply-demand analysis it was concluded that, if utilities begin large-scale applications for FIS, the five legal-weight truck (LWT) casks currently in service would be inadequate to perform all of the needed shipments as early as 1987. This further assumes that a western site would be selected for the FIS facility. If the FIS site were to be located in the East, the need for additional LWT casks would be delayed by about two years. The overweight truck (OWT) cask fleet (two PWR and two BWR versions) will be adequate through 1992 if some shipments to FIS can be made several years before a reactor is projected to lose full core reserve. This is because OWT cask requirements increase gradually over the next several years. The feasibility of shipping before losing full core reserve has not been evaluated. Cask utilization requirements in later years will be reduced if some shipments can be made prior to the time they are actually needed. The existing three rail casks are adequate to perform near-term shipments. 18 references, 4 figures, 18 tables. |