题名: | JOHN BLUE BRIDGE |
正文语种: | eng |
摘要: | BACKGROUND: The three-span, 478-ft-long bridge was designed for construction half-at-a-time in two stages. Staged construction was necessary due to site constraints. These constraints required construction of the first half of the new structure near the e |
出版年: | 2021 |
期刊名称: | Roads & bridges |
卷: | 59 |
期: | 8 |
页码: | 9-9 |