题名: | CHALLENGING DESIGN |
正文语种: | eng |
摘要: | The project design criteria specified a 65-ft minimum vertical clearance from the mean higher high-tide elevation to the low chord of the bridge within the limits of the defined 90-ft navigational channel. The layout of the new bridge was established to s |
出版年: | 2021 |
期刊名称: | Roads & bridges |
卷: | 59 |
期: | 9 |
页码: | 62-62 |