题名: | New Swiss tunnel project |
正文语种: | eng |
摘要: | The DokaMT tunnel system was used at the portals for the tunnel. The package included a preconfigured formwork traveller, with vibrator, concrete placing boom, pipework and filler necks, including carpenter-friendly bottom slab formwork and sealing carria |
出版年: | 2021 |
期刊名称: | World highways |
卷: | 30 |
期: | 10 |
页码: | 26-27 |