题名: | Precision road construction |
正文语种: | eng |
摘要: | The firm is working on the 13.2km Lot 1 stretch of the project, one of five lots for the highway which will stretch 123km when complete and at a total cost of around €1.6 billion. PORR's Lot 1 contract does not face some of the geotechnical challenges of |
出版年: | 2021 |
期刊名称: | World highways |
卷: | 30 |
期: | 10 |
页码: | 43-44 |