原文传递 Construction 2004.
题名: Construction 2004.
关键词: CONSTRUCTION MANAGEMENT; PAVEMENTS; PORTLAND CEMENT; QUALITY ASSURANCE
摘要: Partial Contents: Portland Cement Concrete Pavements (Stringline Effects on Concrete Pavement Construction, Assessment of Profiler Performance for Construction, Quality Control with Simulated Profilograph index, Active Crack Control for Continuously Reinforced Concrete Pavements, Erwin Kohler and Jeffery Roesler); Bituminous pavements (Analysis of Multivariate Models for Evaluating Segregation in Hot-Mix Asphalt Pavements, Automated Temperature Profiling During Hot-Mix Asphalt Construction, Mary Stroup-Gerdiner, Jeff Nixon, and Priyabrata (Thomas) Des Effect of Material Transfer Devices on Flexible Pavement Smoothness, Jennifer Kristy Harris, Frazier Parker, and Mary Stroup-Gardiner Evaluating Nonnuclear Measurement Devices, to Determine in-Place Pavement Density Discussion, Authors' Closure); Quality Assurance (Process for Selecting Innovative Quality Assurance, Practices for Materials, Maturity Method Applied to Highway Construction, Life-Cycle Cost Analysis-Embedded Monte Carlo Approach for Modeling Pay Adjustment at State Departments of Transportation). Construction Management (Context-Sensitive Construction Solutions, Innovative Strategies on Dallas High Five Project, Adventures in Building Another Washington Monument: Rebid Outcomes of Woodrow Wilson Bridge Project; Agency Process for Alternate Design and Alternate Bid of Pavements, Kentucky Transportation Cabinet's Statewide System for Lessons Learned, Deployment of Wireless Mobile Detection and Surveillance for Data-Intensive Applications).
报告类型: 科技报告
检索历史
应用推荐