题名: | Report: Memphis Bridge Cracked From Faulty Weld Repair Before Installation |
正文语种: | eng |
作者: | SHELLEY BYRNE |
摘要: | An analysis of the fracture on three sides of a box beam holding up the Interstate 40 bridge over the Mississippi River in Memphis, Tenn., has determined the crack likely developed in a weld repair before the bridge was built. The cracking took place in a |
出版年: | 2021 |
期刊名称: | The Waterways Jouranl |
卷: | 135 |
期: | 33 |
页码: | 44-44 |