题名: | St. Paul District Plans Winter Lock Work |
正文语种: | eng |
摘要: | The St. Paul Engineer District is preparing for major repairs at six of its Mississippi River locks this winter. Maintenance is scheduled at Lock and Dam 4, Alma, Wis.; Lock and Dam 5A, near Fountain City, Wis.; Lock and Dam 6, Trempealeau, Wis.; Lock and |
出版年: | 2021 |
期刊名称: | The Waterways Jouranl |
卷: | 135 |
期: | 33 |
页码: | 7-7 |