题名: | Dike Repairs Expected To Create Delays At Victoria Rend |
正文语种: | eng |
作者: | SHELLEY BYRNE |
摘要: | Work repairing a stone dike at Victoria Bend on the Lower Mississippi River could cause major delays in transiting the area. The work at Mile 595.5 on the left descending bank began December 2 and is expected to conclude by December 30. The river will be |
出版年: | 2021 |
期刊名称: | The Waterways Jouranl |
卷: | 135 |
期: | 35 |
页码: | 3,21 |