当前位置: 首页> 国外交通期刊数据库 >详情
原文传递 Construction considerations for wick drain ground improvements
题名: Construction considerations for wick drain ground improvements
正文语种: eng
作者: Michael Etezad;Ben Riddell;Ken Bocking;Dennis Becker;Travis Pastachak;Jason Bell;Erik Wimmelbacher;Steve Boileau
作者单位: WSP Golder in Mississauga Ont. Canada;WSP Golder in Mississauga Ont. Canada;WSP Golder in Mississauga Ont. Canada;WSP Golder in Mississauga Ont. Canada;New Gold Rainy River Mine;New Gold Rainy River Mine;New Gold Rainy River Mine;New Gold Rainy River Mine
摘要: A literature review of wick drain ground improvement papers indicates that most of the documents are related to the theoretical aspects of wick drain design, with little to no consideration of aspects associated with field conditions. A practical document summarizing construction considerations is not readily available. Part 1 of this paper provides details on the construction of a very large wick drain project carried out in North America. Special attention has been provided on the construction considerations of the wick drain installation and construction quality control and construction quality assurance to ensure that the wick drains performance would be in accordance with the design. Instrumentation monitoring was also carried out to check the performance of the wick drains during and following the stockpile construction.
出版年: 2022
期刊名称: Geosynthetics
卷: 40
期: 4
页码: 18-25
检索历史
应用推荐