项目名称: |
Project 2c: Alternative and Cost-Effective Bridge Approach Slabs - UMC |
摘要: |
The primary objectives of the proposed project are to investigate the causes for any bumps at the end of the bridge approach slab, and to develop remedial measures or alternative designs for a replacement. It is clear that the problem stems from geotechnical considerations. In many instances compaction of soil under uncertain conditions when the bridge is being constructed may not be properly achieved. Hence, the geotechnical issues are likely to continue to exist. From the structures' point of view, how we can design a bridge approach slab to save construction costs given a certain settlement is a question to answer. |
状态: |
Completed |
资金: |
165220.00 |
资助组织: |
University of Missouri, Columbia<==>Missouri Department of Transportation |
开始时间: |
20080901 |
实际结束时间: |
20100831 |
主题领域: |
Design;Finance;Highways;Pavements;I30: Materials |