Project 2c: Alternative and Cost-Effective Bridge Approach Slabs - UMC
项目名称: Project 2c: Alternative and Cost-Effective Bridge Approach Slabs - UMC
摘要: The primary objectives of the proposed project are to investigate the causes for any bumps at the end of the bridge approach slab, and to develop remedial measures or alternative designs for a replacement. It is clear that the problem stems from geotechnical considerations. In many instances compaction of soil under uncertain conditions when the bridge is being constructed may not be properly achieved. Hence, the geotechnical issues are likely to continue to exist. From the structures' point of view, how we can design a bridge approach slab to save construction costs given a certain settlement is a question to answer.
状态: Completed
资金: 165220.00
资助组织: University of Missouri, Columbia<==>Missouri Department of Transportation
开始时间: 20080901
实际结束时间: 20100831
主题领域: Design;Finance;Highways;Pavements;I30: Materials