摘要: |
The objective of this research study was to perform a thorough evaluation of the feasibility and cost implications for initial system installation and ongoing program and maintenance costs for a Land Port of Entry truck emissions program utilizing Heavy Duty Remote Sensing technology. This study includes funding recommendations to maintain such a program. To meet the study objective, project tasks included the following: (1) Develop a work plan for approval by the Technical Advisory Committee, (2) Review the literature on cross-border truck traffic, truck emissions, and truck emissions testing, (3) Prepare a detailed data collection plan, (4) Implement the data collection plan and provide detailed discussion and analysis to support the proposed testing programs elements and cost components, (5) Prepare a final report and a four-page research note. Cost data were developed for each alternative and includes figures for capital equipment installation and five years of operation and maintenance expenses. The present worth costs for each data plan utilizing contract labor ranged from $1,320,828 to $2,177,467. If employees of ADOT or ADEQ are used, the present worth costs range between $1,140,349 and $1,923,247. |