摘要: |
Segments H and I-1 amounted to 37.5 miles and included the construction of two new 2-lane toll facilities, work on 70 main lane bridges, two frontage roads, tolling booths, and ramps. I-2 was divided into two segments: Segment I-2A and Segment I-2B. Both portions of Segment I-2 consisted of approximately nine miles of roadway, included construction and installation of tolling equipment upgrades, and improvements to an existing four-lane facility. It also contained 20 main lane bridges, eight turnarounds, discontinuous frontage roads, and ramps. Considering this project had a considerable length of both urban and greenfield environments, this project had multiple challenges, especially when factoring in the scale and scope of the project. The solutions needed to address the challenges faced on a highway project required continuous teamwork and collaboration, developing solutions and innovations to manage and deliver this job in time to meet the schedule. |