原文传递 System Requirement Specification for the I-15 Integrated Corridor Management System (ICMS) in San Diego, California.
题名: System Requirement Specification for the I-15 Integrated Corridor Management System (ICMS) in San Diego, California.
关键词: integrated corridor management system,i-15 integrated corridor,san diego(california),system requirements specification,system requirement specification(srs),integrated corridor management system(icms),integrated corridor management(icm) strategies/external requirements, systems integration/external requirements, systems integration
摘要: This document presents a System Requirements Specification for an Integrated Corridor Management System (ICMS) in the I-15 Corridor in San Diego, California. The ICMS will consist of two major subsystems: the existing Intermodal Transportation Management Subsystem and a new, as-yet-undeveloped subsystem to be known as the Decision Support Subsystem. In addition, the ICMS will include organic functions such as Collect and Process Data, Access/Store Historical Data, System Management, and Lifecycle Support. Several existing and planned regional systems will be connected with the ICMS some of these will be upgrades to Intermodal Transportation Management System (IMTMS), some will be new systems. Section 2 provides an overview description of the I-15 ICMS , which includes the ICMS Context, ICMS Description, ICMS User Characteristics, System Constraints and Assumptions, and Dependencies. Section 3 includes a requirements framework, definitions of the I-15 ICMS components and key terms, action verb description, user needs developed in the I-15 Concept of Operations, an overview mind map of the IMCS requirements, and an indexed listing of the system requirements organized according to the ICMS's 17 functional areas. Appendix A provides Definitions, Acronyms, and Abbreviations Appendix B provides Requirements Management Metadata (for future requirements management activity). Appendix C includes U.S. Department of Transportation Comments on the Draft System Requirements Specification for the San Diego ICM Pioneer Site with SANDAG Responses. / Availability Note: Order this product from NTIS by: phone at 1-800-553-NTIS (U.S. customers); (703)605-6000 (other countries); fax at (703)605-6900; and email at orders@ntis.gov. NTIS is located at 5301 Shawnee Road, Alexandria, VA, 22312, USA. / NTIS Prices: PC A08 / Corporate Author Code: 026415022 / Classifivation: Unclassified report
报告类型: 科技报告
检索历史
应用推荐