摘要: |
Go-Ahead London has placed an order for 141 battery-electric buses from the BYD UK and Alexander Dennis partnership, taking the total to be delivered to the operator during 2023 to 299 vehicles. This new order follows Go-Ahead London's success in winning contracts for bus routes tendered by Transport for London (TfL). In total, 169 BYD-Alexander Dennis Enviro400EV double-deckers and 130 BYD-Alexander Dennis Enviro200EV single-deckers are expected to be supplied by the end of 2023, with deliveries already under way. All the double-deckers will be 10.8m long, while the single-deckers will be built to three different lengths of 9.6m, 10.2m and 10.9m to suit different route profiles and passenger volumes. |