摘要: |
In 2015, all eyes were on the Suez Canal as six of the world's major dredging companies assembled an unprecedented amount of equipment to dredge over a million cubic meters of material daily to extend the 193 -km-long canal with a 70-km parallel waterway. And they did that in just nine months. However, at the same time, Egypt was looking at the potential to create a global industrial center based around the six ports - of which three are on the Red Sea and another three on the Mediterranean Sea. |