摘要: |
Project: Able Pump Station, Dallas Engineer of record: Lance Ferland, P.E., HDR Summary: Situated between two historic street viaducts, the pump station provides 100-year flood protection to about 3 sq mi. To help prevent flooding-related deaths, the city of Dallas hired HDR to design the station, which increases pumping capacity nearly fourfold, to 880,000 gal./minute. It also lowers the 100-year flood elevation from 399 ft to a design elevation of 392.5 ft. according to the design team. Project: 1-15; Lehi Main to S.R. 92, Technology Corridor, Lehi, Utah Engineer of record: Boyd Humpherys, P.E., Utah Department of Transportation Summary: The traffic-alleviating project widened Interstate 15 to six lanes in each direction of a 4.4 mi section. It also included two full interchange redesigns with a one-way frontage road system between those interchanges, 15 bridge replacements, a new bridge over 1-15, a new flyover ramp, and bike and pedestrian links to regional trail systems and local transit services. |