题名: |
Proposed Practice for Alternative Bidding of Highway Drainage Systems. National Cooperative Highway Research Program (NCHRP) Report 801. |
作者: |
A., Fuggle; C., Gaywood; G., Hebeler; I. D., Moore; J., Vankerkhove; K., Avery; M., Maher |
关键词: |
Alternative Bidding; Best Practice; Drainage Pipe Systems; Drainage Systems; Economic Analysis; Highway; Maintenance Management; National Cooperative Highway Research Program (nchrp); Pavements; Perfo |
摘要: |
The objective of this research was to develop a recommended practice suitable for adoption by AASHTO to guide owner-agencies and industry in implementing a performance-based process for contractor selection and delivery of drainage pipe systems on highway construction projects. |
报告类型: |
科技报告 |