原文传递 Bumpy Road and a Bridge too Far. An Analysis of the Realistic Bridging and Horizontal Construction Capabilities of the Canadian Military Engineers in the Force 2013 Structure.
题名: Bumpy Road and a Bridge too Far. An Analysis of the Realistic Bridging and Horizontal Construction Capabilities of the Canadian Military Engineers in the Force 2013 Structure.
作者: Swallow, C. L.
关键词: Canada; Capacity(quantity); Construction; Education; Emergencies; Military Bridges; Military Engineers; Roads
摘要: This monograph analyzes the combined effects of changes in engineer training curriculum, adjustments to priorities in vehicle replacement programs, shortages of equipment, and disproportional combat engineer versus integral combat service support growth on the mobility capacity of the Canadian Military Engineers within the proposed Force 2013 structure. Using a modified PRICIE (akin to DOTMLPF) process, the mobility capacity of the current Canadian Military Engineer structure is determined. Finally, the current mobility capacity is evaluated against the requirements of Canada's National Defence Strategy, domestic contingency plans, current Army operating plan, likely future threat scenarios, and historical missions. The research exposes shortfalls in the capacity of the proposed engineer structure to provide mobility to Force 2013. Specifically in the areas of horizontal construction (roads), military bridging, and integral combat service support capabilities at the regimental level.
报告类型: 科技报告
检索历史
应用推荐