题名: |
Environmental Review of the Proposed Keys Energy Center Project |
作者: |
Faustini, C.;Mountain, D.;Johnson, M.;Shotts, D.;Yegnan, A.;Wickstrom, T.;DiAntonio, A.;Sillett, K.;Strebel, D.;Rogers, G.;Brindley, A.;Harriott, S.;Hsll, M.;Hall, P.; |
关键词: |
Environmental impact assessments;Site characteristics;Energy project;Electric power plants;Maryland;Mining operations; |
摘要: |
The Maryland Public Service Commission (PSC) has granted a Certificate of Public Convenience and Necessity (CPCN) to Catoctin Power, LLC, a wholly owned and subsidiary of Sempra Energy Resources to construct and operate a new generating station located in the south-central portion of Frederick County, Maryland, approximately 1.25 miles north of Adamstown, Maryland. The proposed facility will consist of a natural gas-fired, nominal 600 megawatt (MW) electric generating station. The combined cycle facility will be constructed on a 20-acre parcel located within an existing industrial complex owned and operated by Eastalco Aluminum Co., a division of Alcoa Inc. The facility cooling water will be delivered to the facility by pipeline. At publication, Catoctin Power has not selected a source of cooling water but has proposed two options: (1) interconnection with Frederick County's infrastructure to obtain treated effluent from the Ballenger Creek Wastewater Treatment Plant (WWTP) or (2) direct withdrawal from the Potomac River. Should Catoctin Power choose to obtain water from the Potomac River, Catoctin will meet the Potomac River consumptive use regulations by providing upstream low flow augmentation storage for release during periods of low flow in the Potomac River. |
总页数: |
Faustini, C.;Mountain, D.;Johnson, M.;Shotts, D.;Yegnan, A.;Wickstrom, T.;DiAntonio, A.;Sillett, K.;Strebel, D.;Rogers, G.;Brindley, A.;Harriott, S.;Hsll, M.;Hall, P.; |
报告类型: |
科技报告 |