当前位置: 首页> 国外交通期刊数据库 >详情
原文传递 Brief High-Water Period Creates Delays On Ohio
题名: Brief High-Water Period Creates Delays On Ohio
正文语种: eng
摘要: Rain the weekend of May 7-8 brought about a swift rise on the Ohio River, especially in the upper reaches. Due to the high-water conditions, southbound locking at McAlpine Locks and Dam in Louisville, Ky., was limited to daylight hours only through May 13, said Katelyn Newton, chief of public affairs for the Louisville Engineer District. She added that although the district was not experiencing any issues or delays due to drift, the district was flushing drift through the auxiliary chamber at Markland Locks and Dam, which is typical.
出版年: 2022
期刊名称: The Waterways Jouranl
卷: 136
期: 7
页码: 37-37
检索历史
应用推荐