题名: | District Awards Bulkhead Slots Contract |
正文语种: | eng |
摘要: | American Mine Services, Boulder, Colo., was awarded a $2.4 million contract by the St. Paul Engineer District to construct bulkhead slots on the intermediate wall and river wall upstream of the miter gates in the auxiliary chamber at Upper Mississippi River Locks and Dam 3. |
出版年: | 2023 |
期刊名称: | The Waterways Jouranl |
卷: | 137 |
期: | 30 |
页码: | 16-16 |