题名: |
Bailey Pond Dam
NATIONAL PROGRAM FOR INSPECTION OF NON-FEDERAL DAMS |
关键词: |
DAMS. INSPECTION. DAM SAFETY.Merrimack River Basin Amesbury,Mass |
摘要: |
Balley Pond Dam is a 180 foot long earth embankment with concrete walls forming aportion of the upstream face of the dam and the app roach channel to the spillway .The height of the dam is 15ft. Which is the height of the inlet chamber below the spillway. The dam and spillway are generally in fair condition A test flood eoual to 1/2 the PMF was selected. |
报告类型: |
科技报告 |