题名: | SECTION 205 DETAILED PROJECT REPORT FLOOD CONTROL PROJECT AT DEVILE LAKE.NORTH DAKOTA |
关键词: | FLOOD CONTROL NORTH DAKOTA DEVILS LAKE |
摘要: | The Corps of Engineers was requested by the Devils Lake Basin Joint Water Management Board to inveatigate the feasibility of flood control measures at Devils Lake,North Dakota. The board requested the study because the water level has increaned 28 feet in the last 40 years .this rising water level threatens to flood aconsifderable ... |
报告类型: | 科技报告 |