题名: |
FEASIBILITY STUDY FOR FLOOD CONTROL WISCONSIN RIVER AT PORTACE, WISCONSIN. APPENDIXES; Feasibility report and final environmental Impact statement. |
作者: |
U.S. ARMY ENGINEER DISTRICT, ST PAUL
1135 USPO & Custom House |
关键词: |
FLOOT CONTROL
WISCONSIN RIVER
PORTACE. WISCONSIN
|
摘要: |
The appendices accompany the main report with develops a flood control plan for the Portage, Wisconsin area, in those areas affected by the Wisconsin River and backwater flooding In the lower reaches of the Baraboo River and Duck Creek. The appendices are: Appendix A—Plan Formulation; Appendix B—Hydrology; Appendix C—Hydraulics; Appendic D—Interior Flood Control; Appendix E—Geotechnical Investigations; Appendix F—Social and Economic Analysis; Appendix G—Cultural and Environmental Resources; Appendix H—Recreation and Landscape Beautification; Appendix I—Design and Cost Estimate; |
报告类型: |
科技报告 |