摘要: |
The purpose of the feasibility report is to review the existing Ballons
Creek flood control system to determine possible inadequacies in flood control channels and determine the potential for flood control improvements in areas of unimproved tributaries. The primary flood problem found involved channel overflow caused by bridge constrictions in highly urbanized areas along Main Ballons Creek Channel.
Both structural and nonstructural plans were investigated ,However,no plan was determined to have economic Justification; therefore, no Federal
participation in additional flood control improvements on the Ballons Creek
system is recommended at this time.
The report was prepared to document the investigation and to provide local interests with the resulting information.
|