题名: | Operators Preparing For Scheduled Closures At Lindy C. Boggs, Old River Locks |
正文语种: | eng |
作者: | Frank McCormack |
摘要: | The New Orleans and Vicksburg Engineer Districts have a pair of lock closures scheduled for this summer and fall that will temporarily disrupt navigation on both the Red and Ouachita rivers. The first and longest closure will occur at Old River Lock, which is set to close this summer. |
出版年: | 2022 |
期刊名称: | The Waterways Jouranl |
卷: | 136 |
期: | 5 |
页码: | 7-7 |