原文传递 Evaluation of the Reynolds Orthotropic Aluminum Bridge Deck System. Corbin Bridge Application Final Report
题名: Evaluation of the Reynolds Orthotropic Aluminum Bridge Deck System. Corbin Bridge Application Final Report
作者: Robin Sukley, Research Engineer Joseph Spall, Engineering intern
关键词: a. Descriptors Aluminum bridge decks. Orthotropic, Suspension bridges b. Identifiers Open-Ended Terms Flexolith, Extruded aluminum, Suspension Bridges c. COSATI Field/Group
摘要: The purpose of this project was the rehabilitation of the Corbin Bridge in Huntingdon County, Pennsylvania. The project consisted of replacing the deck with the Reynolds Orthotropic Bridge Deck System. The rehabilitation of the bridge increased the posted load rating from 7 tons to 24 tons by replacing the steel deck with an aluminum deck while strengthening parts of the existing steel members. Satisfactory performance required that the deflections be within design limits and no visual distress present The following report is a combination Construction and Final Performance Report for evaluation of the structure rehabilitated in 1996.
报告类型: 科技报告
检索历史
应用推荐