题名: | Dredge E. Stroud To Work In Mobile |
正文语种: | eng |
摘要: | The Mobile Engineer District reports that the Mike Hooks pipeline dredge E. Stroud will begin maintenance dredging operations about April 8 in the southern end of the Mobile River in the vicinity of APM Terminals and the upper bay turning basin. The dredge will place material in the north Pinto upland disposal area adjacent to the channel. The project is expected to continue for two to three months. The dredge can be contacted on VHF channels 13 and 16. |
出版年: | 2022 |
期刊名称: | The Waterways Jouranl |
卷: | 136 |
期: | 1 |
页码: | 12-12 |