关键词: |
coaling, inflection, life cycle cost analysis, Markov Chains Process,
metalization, painting, quality control, steel bridge, warranty
Clauses.
|
摘要: |
The study identifies various painting systems that are successfully used in Indiana’s surrounding states and other industries. The identified Systems are further screened and evaluated. After prudently comparing INDOT’s inorganic zinc / vinyl system with the waterborne acrylic system, dte moisture cure urethane coating system, and the 3-ooat system of zinc-epoxy-urethane, the results show that the new 3-coat system fulfills INDOT’s needs with the most benefits. Therefore, the 3-coat system is recommended to replace INDOT present inorganic zinc / vinyl system.
To deal with the problems facing the lead-based paint, a comparison between full-removal and over-coating alternatives is made. Results show that over-coating might provide a good protection for less than half the cost of full-removal; however it delays the lead full-removal process and does not completely solve the environmental problem.
The metalization of steel bridge is seemingly a potential protection policy. After reviewing standards and specifications on metalization, it is shown that metalization jobs require a higher degree of control. It suits on-shop practices, however. the initial cost is considerably high. This study also describes a life cycle cost analysis that was done to determine an optimal painting system for INDOT. Herein, a deterministic method of economic analysis and a stochastic method of Markov chains prom are used. The analysis not only reconfirms dud the 3-coat system is the comparative^ belter painting system, but also generates an optimal paint ng maintenance plan for INDOT.
To assure the quality of paint material and workmanship after substantial completion of the painting contract, the development of legally binding and dependable warranty clauses is initiated in this study. The developed painting warranty clauses were primarily derived from the painting warranty clauses used HX>T, MDOT, and INDOT’s pavement warranty clauses. A comparative study was conducted eleven essential categories. Among them, it was found thet the warranty period, the definition of “defect”, and the amount of the warranty Kond all need further evaluation.
|