摘要: |
Reference: Ministry's Letter No. RW/NH-34049/01/2020-S&R (P6B) pt.dated 30.08.2022 Madam/Sir,In continuation to the above referred circular of Ministry, following have been decided:ⅰ. The Executing Agencies of MoRT&H shall do the Value Engineering during Feasibility/DPR of the project itself as detailed in para 5.1 & 5.2 of the Ministry's circular even no. dated 30.08.2022.ⅱ. For the upcoming Projects, Value Engineering may be kept open after award of the work in respect of the items which are not pre-decided as certain components are fixed based on multiple considerations of reliability, durability, amenability for consistency checks, etc. |