摘要: |
Contents: Economic Assessment (Overview, Cost Components, Fixed Costs, Variable Costs, General Description of Testing Scenarios, Variable Cost Per Test, Direct Labor, Labor Overhead, Other Direct Costs, Repeat Tests, General and Administrative Overhead, Summary of Variable Cost per Test, Variable Cost Per Engine Family, Vehicle Incentive, Direct Labor, Travel, Labor Overhead, General and Administrative Overhead, Summary of Variable Cost per Engine Family, Costs of the Proposed Program); On-Vehicle Portable Emissions Measurement Technology Review (Overview, Measurement Technologies). New In-Use Testing Instrument Measurement Allowance ( Review of NTE zone, Review of existing NTE allowances, Review of other proposed NTE allowances, Discussion of the two (2) proposed NTE measurement allowances). Appendix A: Examples of Determining the Number of Engine Families to be Tested. |