题名: |
Development and Validation of a Method Selection Tool for Expediting Highway Construction. |
作者: |
haas, c. t. gibson, g. e. o'connor, j. t. zhang, z. anderson, c. k. |
关键词: |
*Highway-construction; *Construction-administration; *Expediting-; *Software-.;Selection-tools; Methodology-; Validation-; Texas-; Recommendations-. |
摘要: |
The interim report (4386-1) identified, described, and discussed expediting methods that could be used in various phases of highway construction. Continuing the objectives of the first-year research, a system has been developed for Area Engineers and assistants to select proven, yet innovative, methods to expedite highway project delivery. The system consists of both a paper and computer version. This report, as the conclusion of the research study, covers the development and validation of this Expediting Method Selection Tool. The final version of the tool evolved from feedback gathered from three demonstration seminars held with TxDOT Area Engineers and other TxDOT and industry personnel. The Project Director and Coordinator also provided feedback and guidance on the development of the final version of the tool. Recommendations for implementation of the tool are provided. |
报告类型: |
科技报告 |