题名: | John T. Myers Lock Gate Rehab Completed In 81 Days |
正文语种: | eng |
作者: | SHELLEY BYRNE |
摘要: | A collaboration between the Louisville Engineer District and the Great Lakes and Ohio River Division's Regional Rivers Repair Fleet (R3F) resulted in greatly accelerated gate miter repairs at the fifth busiest lock in the nation. The $13.3 million project |
出版年: | 2024 |
期刊名称: | The Waterways Jouranl |
卷: | 137 |
期: | 44 |
页码: | 6-6 |