题名: | Willow Island L&D Main Chamber Closure Set |
正文语种: | eng |
摘要: | The Huntington Engineer District reports work will begin on or about April 15 to replace the hydraulic system on the main lock chamber at Willow Island Locks and Dam, Ohio River Mile 161.7. During the work, the main chamber will be closed to all traffic. |
出版年: | 2024 |
期刊名称: | The Waterways journal |
卷: | 137 |
期: | 51 |
页码: | 9-9 |