原文传递 Mississippi DOT's Plan to Implement the 2002 Design Guide. Final rept.
题名: Mississippi DOT's Plan to Implement the 2002 Design Guide. Final rept.
作者: Saeed-A.; Hall-J.W.
关键词: *Pavement-design; *Mississippi-; *Research-and-development; *Design-guidelines.;Tables-Data; Plans-; Design-criteria; Costs-; Forensics-; Road-materials; Failure-analysis; Flexible-pavements; Empirical-Methods; Factorial-design; Calibration-; Technology-transfer.
摘要: Applied Research Associates, Inc. is finalizing the development of the 2002 Guide For Design of New and Rehabilitated Structures through National Cooperative Highway Research Program (NCHRP) Project 1-37A. The Mississippi DOT is implementing the design guide in two phases. An implementation plan is developed in Phase I, and actual implementation of the Design Guide occurs in Phase II.
报告类型: 科技报告
检索历史
应用推荐