当前位置: 首页> 国外交通期刊数据库 >详情
原文传递 Concrete Sill Repairs At Demopolis Lock Are Nearing Completion
题名: Concrete Sill Repairs At Demopolis Lock Are Nearing Completion
正文语种: eng
作者: FRANK MCCORMACK
摘要: There's light at the end of the lock chamber for stakeholders of both the Black Warrior-Tombigbee Waterway (BWT) and the Tennessee-Tombigbee Waterway (Tenn-Tom), with emergency repairs almost complete at Demopolis Lock on the Tombigbee River in east centr
出版年: 2024
期刊名称: The Waterways journal
卷: 138
期: 7
页码: 12-12
检索历史
应用推荐