题名: | Demolition Of Lower Mon Dam 3 At Elizabeth Set For July |
正文语种: | eng |
作者: | SHELLEY BYRNE |
摘要: | Beginning the week of July 8, the Pittsburgh Engineer District plans to demolish the more than 100-year-old Monongahela Locks and Dam 3 at Elizabeth, Pa. The facility, which has been in operation since 1907, is being removed to form a 30-mile stretch of n |
出版年: | 2024 |
期刊名称: | The Waterways journal |
卷: | 138 |
期: | 6 |
页码: | 7-7 |