原文传递 Second Inspection Report for Fatigue Evaluation Bridge 9340 I-35W over Mississippi River.
题名: Second Inspection Report for Fatigue Evaluation Bridge 9340 I-35W over Mississippi River.
关键词: *Highway-bridges; *Trusses-; *Structural-analysis; *Finger-joints; *Rocker-bearings; *Roller-bearings; *Fatigue-Materials; *Minnesota-; *Bridge-inspection.;Mississippi-River; Bridge-decks; Photographs-; Welded-joints; Fatigue-cracking; Truss-plates; Joints-Junctions; Loads-Forces; Retrofitting-.
摘要: We have completed the second field inspection of the main truss section of Bridge 9340 (TH 35W over the Mississippi River). The inspection was performed utilizing MnDOT's snooper truck on November 17th and 18th, 2003. The purpose of the inspection was to observe the current position of the finger joints, rocker bearings, and roller bearings and to make measurements indicating various movements and rotations. The attached photo log can be referenced for specific pictures of various areas within the truss.
报告类型: 科技报告
检索历史
应用推荐