原文传递 Field Performance of Timber Bridges 19. North Yarmouth Stress- Laminated Truss Bridge
题名: Field Performance of Timber Bridges 19. North Yarmouth Stress- Laminated Truss Bridge
作者: Habib J. Dagher Frank M. Altimore Vincent Caccese Michael A. Ritter
关键词: timber, bridge, wood, stress-laminated, truss
摘要: The North Yarmouth bridge was constructed in the spring of 1994 in North Yarmouth, Maine. The bridge is a single span, two-lane, stress-laminated truss structure that is approximately 39 ft long and 32 ft wide. The truss laminations were produced using chromated-copper-arsenate- (CCA-) treated Southern Pine connected with metal plate connectors. This report includes information on the design, construction, and field performance of the bridge. Performance of the bridge was monitored for approximately 4 years, beginning shortly after bridge construction. During the field-monitoring pro ­ gram, data were collected related to the wood moisture con ­ tent, the force level of the stressing bars, behavior under static truck loading, and overall structural condition. Based on 4 years of field evaluations, the bridge is performing well with no structural or serviceability deficiencies.
报告类型: 科技报告
检索历史
应用推荐