原文传递 Rock Demolition and Hazardous Debris Removal for Ecosystem Restoration on the Elwha River.
题名: Rock Demolition and Hazardous Debris Removal for Ecosystem Restoration on the Elwha River.
作者: Ertle, C. W.; Roth, M. J.; Judson, J. S.; Vankirk, G. H.
关键词: Demolition, Ecosystems, Dams, National parks, Explosives, Fish, Ecology, Elwha river, Ecosystem restoration, Elwha dam, Glines dam, Debris removal, Rock demolition
摘要: The Elwha River is a unique river system located on Washingtons Olympic Peninsula and was dammed in the early 20th century for hydroelectric power. Approximately one century later, these dams, the Elwha Dam and Glines Canyon Dam, were removed to restore the rivers natural ecosystem. In 2015, the National Park Service (NPS) engaged with the U.S. Army Engineer Research and Development Center (ERDC) to provide subject matter expert support to the final stages of the restoration project. In September 2016, ERDC conducted a project for removal of hazardous rebar that was remaining in the river bed at the Elwha Dam site. The rebar was protruding from the dam foundation and created a safety hazard for the public. The project also included explosive demolition of numerous large boulders in the vicinity of the former dam sites that created flow constrictions with large velocity gradients and hydraulic jumps. The demolition objective was to improve passage conditions for the numerous species of trout and salmon that migrate up the Elwha River. This report documents the rebar removal and boulder demolition and provides recommendations for techniques to remove the remaining Elwha Dam foundation in the future if desired by NPS.
报告类型: 科技报告
检索历史
应用推荐