题名: | Holt Lock Facing Months-Long Closure |
正文语种: | eng |
作者: | FRANK MCCORMACK |
摘要: | The Mobile Engineer District is moving closer to identifying temporary and permanent fixes to the monolith instability issue that forced an emergency closure of Holt Lock on the Black Warrior River in Tuscaloosa, Ala., June 22. Cracks in the monolith and |
出版年: | 2024 |
期刊名称: | The Waterways journal |
卷: | 138 |
期: | 16 |
页码: | 5,12 |