当前位置: 首页> 国外交通期刊数据库 >详情
原文传递 Holt Lock Facing Months-Long Closure
题名: Holt Lock Facing Months-Long Closure
正文语种: eng
作者: FRANK MCCORMACK
摘要: The Mobile Engineer District is moving closer to identifying temporary and permanent fixes to the monolith instability issue that forced an emergency closure of Holt Lock on the Black Warrior River in Tuscaloosa, Ala., June 22. Cracks in the monolith and
出版年: 2024
期刊名称: The Waterways journal
卷: 138
期: 16
页码: 5,12
检索历史
应用推荐